To the central content area

111Soil and Groundwater Pollution Survey and Verification Project - New Taipei City

Absrtact
The Environmental Protection Department of New Taipei City government has implemented the ’Soil and Groundwater Investigation and Verification Project’ since 2004. It has been continuously monitoring the quality of soil and groundwater to prevent pollution from source to the end-of-pipe. This year, the groundwater monitoring and monitoring well function maintenance work has been completed. Regarding groundwater pollution, Shulin Industrial Park was measured with cis-1,2-DCE and VC, it has not spread beyond the region. There is nothing special about groundwater in other sites. Regarding the storage tank system, not only the paperwork was completed, but 6 sites were also investigated. One of them were selected for soil or groundwater pollution verification, and no illegal activities were found. A total of 4 publicity activities were handled in this year: Includes 1 entity briefing was handled. Affected by the covid-19 epidemic of the year, 2 online briefings were handled. In addition, an on-site teaching course was held. A total of 58 companies, listed under §8 or §9 of the Law of ‘Soil and Groundwater Pollution Remediation Act’, have submitted soil pollution assessment survey data to The Environmental Protection Department of New Taipei City government for review. We are continuously reviewing and selecting 35 sites to confirm the sampling operations. Regarding contaminated sites, there are 48 contaminated sites in New Taipei City currently. We conduct site inspections 1~2 times every month after we classify those sites. And we have done 3 pollution certifications in this plan. In addition, we executed phase I and found out 7 factories with high pollution potential. Then we carried out phase II and confirmed that the soil or ground water pollution concentrations in 3 of them exceeded the control standards. This year, 269 units completed the work of confirming the compliance of storage system inspection laws and regulations, among them, a total of 34 didn't comply with the relevant provisions of the management measures. In addition to increasing the monitoring of sites with potential pollution potential, 2 monitoring wells (F00326 and F00130) were also repaired; investigate the quality of groundwater around 2 sites, phase I of 3 factories around RF-08 in Reifang Industrial Park; soil gas investigation at military sites; groundwater pollution investigation of Tezhen company.
Keyword
Soil and groundwater, pollution investigation, verification
Open
top